Skip to toolbar
An Ewok Transformed

An Ewok Transformed

Supported by (Turn Off)

Day 6.7.8 Sandbags sandbags sandbags sandbags sandbags

Tutoring 9
Skill 9
Idea 9
No Comments

So I decided to line the trenches with sandbags down both sides. So thats 24 feet of sandbags at 4-5mm each, so roughly 17-1800 individual bags.

Day 6.7.8 Sandbags sandbags sandbags sandbags sandbags

I plan to spray the whole trench area black, then drybrush in features and add weathering and so forth.

Day 6.7.8 Sandbags sandbags sandbags sandbags sandbags

I used the weekend to get some paint on the final two sections, I added 3d printed elements with hot glue, just need to cut up yet more coffee stirrers for the flooring and then get the sandbags down.

Leave a Reply

Supported by (Turn Off)