Zebraoutrider joins the Ordo Xenos and the Mubraxis Dustdogs
Display board WIP - plaster, paint and sand everywhere!
Work on the board had progressed with plastering – well old school shredded newspaper and PVA glue to cover the polystyrene.
Preparation time: 2 hours
Drying time: 12 hours
The second stage was to spray paint the plastered area with Averland Sunset. This was done outside for ventilation.
Spray time: 10 mins
Drying time: 2 hours
The third stage was to cover the painted surfaces in PVA glue and sprinkled play sand followed by a soaking of a mixed solution of 1:5 PVA:water and another sprinkling of sand. Around 7.5 KG of sand was used.
Sanding time: 2 hours
Drying time: 48 hours
Leave a Reply