Laughingboy's Hobby Lodge
First some graft is needed
So one of the first jobs to be done was to clear the space so the build could be completed. This included breaking down 2 old sheds, moving a children’s playhouse (mini cabin) and clear down enough branches from the trees to slot the cabin in beneath.
This was all fine except when we found beneath the old sheds there was 40 (yes I counted and so did my back) concrete slabs that needed to come up, be carried through the garden and house to a skip probably a 100 metres away.
Anyway, we got there and the open space looked great.
Leave a Reply