Skip to toolbar
To the Trenches! Chain of Command

To the Trenches! Chain of Command

Supported by (Turn Off)

How its done ....

Tutoring 4
Skill 4
Idea 4
No Comments

I build up the front of the trench first and that will then shape how the rear section needs to be consturcted.

Generally, the walls are 7 planks high – but I add in some variation of this in places.

As each panel is make, I glue them together (I expect this to break several times through moving / positioning – but it allows me to see how the shape is forming).

As I construct, I keep using off cuts of the strips of plywood to “plan” out the final shape.

I always aim to build so I have approx 3.5cms between the front section / rear section – which gives plenty of space for a standard base to fit.

Leave a Reply

Supported by (Turn Off)