Skip to toolbar
Building the Old West

Building the Old West

Supported by (Turn Off)

Saloon Pt 6

Tutoring 2
Skill 3
Idea 3
No Comments
Balcony and railings glued in. Balcony and railings glued in.
Second floor and stairs dry fitted into place. Still need to finish the balcony rail. Second floor and stairs dry fitted into place. Still need to finish the balcony rail.
A different view of the stairs. As designed, the only contact point for the stairs will be to the floor of the second story. If glued into place the stairs would come off when you remove the second story. That’s not tenable so the stairs will have to be a separate assembly. A different view of the stairs. As designed, the only contact point for the stairs will be to the floor of the second story. If glued into place the stairs would come off when you remove the second story. That’s not tenable so the stairs will have to be a separate assembly.
Just a mock up for now but I’m thinking something like this for the stairs. Just a mock up for now but I’m thinking something like this for the stairs.
Glued the walls into place and the support pieces to help align them. Glued the walls into place and the support pieces to help align them.
View showing roof and stairs in place and the false front. View showing roof and stairs in place and the false front.
Still have a lot of window details to finish but this is a pretty good representation of what the final form will be. Still have a lot of window details to finish but this is a pretty good representation of what the final form will be.

Leave a Reply

Supported by (Turn Off)